The short answer
To install court tiles, sweep the pad clean, snap a chalk line square to one edge and start in a corner. Follow the numbered plan, pressing each tile into the last and seating the locks with a rubber mallet. Trim around posts with a fine-tooth saw, leave a small expansion gap at the perimeter and add edge pieces last.
What you need before you start
A court kit goes down on a flat, hard base. Concrete is the first choice and sound asphalt works too. Grass, soil and loose gravel will not hold the surface flat.
You do not need trade experience. If you can follow a numbered drawing, you can build the court. Gather the tools below and check the plan against the pallet before the first tile goes down.
- Stiff broom or leaf blower
- Tape measure
- Chalk line
- Rubber mallet
- Fine-tooth saw for cuts around posts
- Gloves and knee pads
- The numbered layout plan from your kit
Step by step: laying the tiles
Work through the steps in order and do not skip the chalk line. A court that starts square stays square.
- Step 1: Sweep the pad. Clear grit, twigs and anything else that would hold a tile off the surface.
- Step 2: Measure the pad and mark where the court will sit, allowing for the expansion gap shown on your plan.
- Step 3: Snap a chalk line along one long edge, then a second line square to it. These are your guides.
- Step 4: Start in the corner the plan names. Set the first tile exactly on both chalk lines.
- Step 5: Follow the numbered plan row by row, pressing each tile into its neighbour by hand.
- Step 6: Seat every lock with a rubber mallet. A tile that sits proud is not locked.
- Step 7: Check against the chalk line every few rows and correct any drift before it grows.
- Step 8: Trim tiles around hoop poles and net posts with a fine-tooth saw.
- Step 9: Keep the expansion gap clear at the perimeter and beside any wall, curb or post.
- Step 10: Add the edge pieces last. Then walk the court and tap down anything that feels loose.
Cutting around posts and obstacles
Hoop poles, net posts and drain covers are where the cuts happen. Hold the tile in position, mark it, lift it out and cut along the mark with a fine-tooth saw.
Leave a small gap around every post, the same as at the perimeter, so the surface can move without binding.
Why the expansion gap matters
Plastic tile grows a little in summer heat and shrinks in winter cold. A court jammed tight against a curb, wall or post has nowhere to go and can lift. The gap on your plan gives it room.
The surface floats on the pad. Nothing is glued or fastened to the concrete. That is also why sections can be unlocked and lifted later to reach the base, move the court or extend it.
How long does it take?
Plan an afternoon for a basketball half court with two or three people. A pickleball or multi-game court takes about a day. Tennis and full-court basketball kits are weekend jobs for a larger crew.
Pick a dry day. Stage the pallet contents beside the pad in plan order so nobody has to hunt for the next section.
Reviewed November 2026. Kit prices are in Canadian dollars before freight and tax and are confirmed on your quote.